First mining farm in which anyone can invest.

    2.5
    • 2.5
      Site
    • 2.5
      Team
    • 2.5
      Idea
    • 2.5
      Tech
    • 2.5
      Media
    • 0.0
      Users

    Copy this code to share our widget

    Status: ended
    Public sale: 01 Oct`17-31 Oct`17
    Cap: No info
    Goal: No info
    • Internal financing

      - July-August 2017- Development of technical specifications/documentation- Signing of an agreement with Innosilicon on microchips’ purchase. Signing of an agreement with J&W on production, assembly and testing of our mining equipment.

    • PRE-ICO 504 000 TRM

      - September 2017- Purchase of A4+ INNOSILICON chips for the first batch. The production of the first equipment batch with 504 000 Mh/s power.

    • ICO 2 320 000 TRM

      - October 2017- Premise preparations for mining equipment installation.- Purchase of A4+ INNOSILICON chips for the second batch. Production of the second equipment batch with 2 3000 Mh/s power.

    • POST-ICO 200 000 TRM

      - November 2017- Getting the premises ready for the mining equipment installation. Installation of the first batch of equipment with 504 000 Mh/s power. The launch of mining. The launch of mining POOL.

    • The 2nd batch launch

      - December 2017- Installation of the second batch of equipment with 2 320 000 Mh/s power.- Entry into exchange. Time to sell tokens.

    • The 3rd batch launch

      - January 2018- Installation of the third batch of equipment with 200 000 Mh/s power.- We have already planned the launch for the next ICO with increase of mining-farm power by 3 Th/s. The farm power will double.